Calc Stop Date~: Difference between revisions

From VistApedia
Jump to navigationJump to search
Jeannette (talk | contribs)
No edit summary
(No difference)

Revision as of 21:18, 15 April 2006

Calc Stop Date
Calculated Stop Date. This is the date that would have been the default Stop Date/Time for an order if no duration was received from CPRS. Due to the existence of a duration, the default Stop Date/Time of the order becomes the expected first dose plus the duration.


Source: Inpatient Medications V. 5.0 Nurse’s User Manual


This is a Glossary term from the VistA Documentation Library